CHURCH MERAKI REFRESH PROJECTReady
ON-SITE ACCEPTANCE · PAGES 17–21

Church-Provided Quality
Acceptance Checklist

Complete this checklist on-site prior to closeout.

Progress saves on this browser and device. Save a PDF to keep a completed inspection.

Inspection details

FIELD RECORD
ACCEPTANCE REVIEWED0 / 15
YES0
NO / NEEDS ATTENTION0
N/A0
CLOSURE COMPLETED0 / 30
01 / QUALITY ACCEPTANCE

Acceptance items

Source pp. 17–18 ↗
Record Yes, No, or N/A for each acceptance item.
02 / TECHNICIAN NOTES

Site notes & escalations

PAGE 18

Escalations

03 / CABLING RECORDS

Cabling notes

PAGES 18–19

Set the number of APs installed to show that many AP rows. Notes and photos are kept if you reduce the count and increase it later. Add multiple photos to each drop. Only checked drops and their photos appear in the PDF. Photos save in this browser and device.

Run IDInstalledNotes
SITE PHOTOS

Pathways, rooms & other photos

Add several photos per section. These photos are included in the PDF.

04 / MATERIAL USAGE

Material usage log

OPTIONAL · PAGE 19
05 / SITE CLOSURE

Final site closure checklist

PAGES 19–20
06 / SIGN-OFF

Technician signature

PAGES 20–21

Enter each technician’s details and typed signature.

07 / SUBMISSION

Submit completed checklist

PDF ATTACHMENT

Checking email sender…

All fields are optional. Submit to download your PDF, including any unanswered acceptance items. Only checked cabling entries appear in the PDF. Enter a recipient to also email it when the sender is connected.